ZHOU Xiao-ming, XIAO Hua, CHEN Chao-lu. Three Core Systems Integration in Changsha Metro Line 2[J]. Electric Drive for Locomotives, 2014,(4):1-4. DOI: 10.13890/j.issn.1000-128x.2014.04.001.
Framework, system feartures and advantages of traction system, braking system and signal system in Changsha metro line 2 vehicles were describled, and advantages of the three core system integrated by the same company were expounded, which provided large system integration experiences for metro field.
关键词
长沙地铁2号线地铁车辆系统集成牵引系统制动系统信号系统
Keywords
Changsha metro line 2metro vehiclesystem integrationtraction systembraking systemsignal system