您当前的位置:
首页 >
文章列表页 >
Theoretical calculation model and verification of installation clearance for traction motor bearings on CRH380B high-speed trains
Special Issue on Autonomous Safety Assurance and Intelligent Operation and Maintenance of Rail Transit | 更新时间:2026-02-24
    • Theoretical calculation model and verification of installation clearance for traction motor bearings on CRH380B high-speed trains

    • “Experts have established a theoretical calculation model to address the difficulty in determining the clearance during the installation and measurement of traction motor bearings for high-speed trains. This model calculates the reduction in clearance based on the fitting relationship between adjacent components of the bearing, taking into account the elastic deformation between the rolling elements and the raceway caused by shaft lifting during the measurement process. The elastic deformation amount is calculated based on Hertz contact theory, and the influence of this deformation amount on the installation measurement clearance is studied and analyzed. Theoretical analysis and experiments have shown that the theoretical installation measurement clearance calculated by this model is consistent with the actual results. At the same time, based on the structural parameters of the CRH380B high-speed train traction motor, the reasonable range for measuring the clearance of the motor bearing installation has been determined, providing a quantitative basis for ensuring the quality of the traction motor bearing press fit and a new idea for determining the reasonable range for measuring the clearance of other types of traction motors.”
    • Electric Drive for Locomotives   Issue 5, Pages: 165-169(2025)
    • DOI:10.13890/j.issn.1000-128X.2025.03.105    

      CLC: U292.91+4
    • Received:01 June 2024,

      Revised:2024-12-03,

      Published:10 September 2025

    移动端阅览

  • WANG Tao, XUE Xiuhui, LI Wei, et al. Theoretical calculation model and verification of installation clearance for traction motor bearings on CRH380B high-speed trains[J]. Electric drive for locomotives,2025(5): 165-169. DOI:10.13890/j.issn. 1000-128X.2025.03.105.WANG Tao, XUE Xiuhui, LI Wei, et al. Theoretical calculation model and verification of installation clearance for traction motor bearings on CRH380B high-speed trains[J]. Electric drive for locomotives,XXXX(XX): 1-5.

  •  
  •  

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on installation solution of eddy current braking devices on EMU bogies
Optimization of constant-speed control algorithm for high-speed EMUs
Analysis of critical time delay in active lateral suspension systems for high-speed trains
Technological development and prospect of China's high speed EMU bogies
Study on control method for fast neutral section passing of high-speed EMUs

Related Author

LIU Chao
ZHAO Wenxue
FAN Jun
HAN Qingli
CHEN Bingzhi
XIONG Yan
ZHOU Shangru
XU Qing

Related Institution

Zhan Tianyou College of Dalian Jiaotong University
CRRC Changchun Railway Vehicles Co., Ltd.
School of Traffic & Transportation Engineering, Central South University
Zhuzhou CRRC Times Electric Co., Ltd.
College of Electromechanical Engineering, Changsha University
0