最新刊期

    1 2014
    • DING Rong-jun,LIU Guo-you
      Issue 1, Pages: 1-6(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.002
      摘要:According to application requirements of high-voltage IGBT for rail transit traction application, technical characteristics ofIGBT chip and its module were analyzed respectively. IGBTs for the traction application should have higher power density, higher operationtemperature and be more intelligent and reliable in the future thanks to the technology development of IGBT design and process.  
      关键词:IGBT;chip;module;technical characteristics;technology development;rail transit   
      1159
      |
      14
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907149 false
      发布时间:2021-12-13
    • LIU Guo-you,QIN Rong-zhen,HUANG Jian-wei,Ian Deviny,WU Yi-bo,YU-Wei
      Issue 1, Pages: 7-10(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.031
      摘要:Three IGBT short circuit types had been introduced. The short circuit type 2 had been enhanced through optimization of theIGBT transistor gain to withstand higher short circuit current. Additionally, the IGBT short circuit over current had been suppressed by thegate drive clamping design. As a result, the high-voltage IGBT modules had successfully passed the short circuit testes required by tractionapplication.  
      关键词:IGBT;short circuit;transistor gain;clamp;high-power converter;rail traction   
      1044
      |
      6
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907134 false
      发布时间:2021-12-13
    • MA Bo-le,YANG Guang,XIN Li
      Issue 1, Pages: 11-15(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.032
      摘要:Several IGBT parallel methods for engineering application were introduced, and the technology cruces of IGBT directlyparallel were particularly presented. A IGBT parallel scheme for IGBT directly parallel was proposed, technology research and engineeringdevelopment of which including academic analysis, investigative experiments and operating test was processed. The results of experimentsindicated that the proposed parallel scheme had better current balancing and higher reliability, and had an extensive engineering applicationprospect.  
      关键词:IGBT;parallel connection;directly parallel;driving;PWM rectifier   
      955
      |
      7
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907123 false
      发布时间:2021-12-13
    • HUANG Cai-hong,LIANG Shu-lin,SONG Chun-yuan,ZENG Jing
      Issue 1, Pages: 16-20(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.003
      摘要:The low-frequency carbody cross swaying of some CRH high-speed trains were emerged in the process of line tests, whichcaused a significant deterioration for passengers ride comfort. In order to obtain the effective measures to suppress the carbody swaying, themultiple rigid body dynamic model of a high-speed vehicle was set up firstly. Then, based on the time domain dynamic simulations, the mainfactors influencing the low-frequency carbody swaying were obtained. At last, the root lotus analysis was used to investigate the effect ofcritical parameters on the low-frequency carbody swaying. It was shown that, proper selection of suspension parameters, wheel railparameters and carbody mass parameters could avoid the offensive low-frequency carbody swaying.  
      关键词:high-speed vehicle;high-speed EMUs;low-frequency swaying;ride comfort;carbody hunting;root locus analysis technology   
      1013
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907109 false
      发布时间:2021-12-13
    • SONG Yu-mei,LIU Chen,YOU Xiao-jie,GUO Xi-zheng,WANG Jiang-bo
      Issue 1, Pages: 21-25(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.004
      摘要:Three-phase inverter, LC filter and charger simulation model of HXD2C electric locomotive auxiliary converter system werebuilt by input-output describing method and several ways of solving discretization method were discussed. The entire test of ACU-in-theloopsystem was formed by the ACU(auxiliary control unit) with dSPACE, which provided DS5203 FPGA board for overcoming thevibration in real-time simulation of power electronic system simulation. The simulation system could be used for analyzed system performanceof auxiliary converter system or test of ACU, which was help for the research of high-performance control algorithm and enhance thetechnology development of electric locomotive.  
      关键词:auxiliary converter system;dSPACE;real-time simulation;hardware in the loop;discretization method;HXD2C electriclocomotive   
      851
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907094 false
      发布时间:2021-12-13
    • CHEN Hong,LENG Li-ying,YIN Mei,WANG Shuo
      Issue 1, Pages: 26-28(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.005
      摘要:Cooling system was designed for 30 t heavy-axle freight locomotive auxiliary converter cabinet air-cooling high-power IGBTmodule to insure product operation stable and reliable. By combination of theoretical calculation and global temperature field analysis forpower module with Fluent, radiator performance was verified and regulated for optimal effect to satisfy system requirement, shortendevelopment cycle and reduce cost.  
      关键词:power module;IGBT;radiator;fluent software;simulation;auxiliary converter cabinet;heavy-axle freight locomotive   
      993
      |
      5
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907079 false
      发布时间:2021-12-13
    • ZHAO Xiao-qian,GUAN Feng
      Issue 1, Pages: 29-32(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.006
      摘要:Aimed at the Ministry of Railway issued AC traction motor design requirements for 4 400 HP AC drive shunting diesellocomotive, the company independently developed CDJD113 three-phase asynchronous traction motor was introduced, including its electromagneticdesign, structure design principles and its main parameters. Prototype testing and proving results showed that the designed anddeveloped CDJD113 asynchronous traction motor could meet the requirements of the specification with the advantages of good performancesand high reliability.  
      关键词:4400 HP shunting diesel locomotive;three-phase asynchronous traction motor;variable-frequency speed adjustment;diesellocomotive   
      900
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907070 false
      发布时间:2021-12-13
    • LIU Xiao-jing,LI Fu,ZHOU Yang,AN Qi
      Issue 1, Pages: 33-36(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.007
      摘要:To research the influence of longitudinal impact on stability and comfort index, coupled EMUs model was built, andtraction force, braking force and basic resistance were applied to the dynamic model by co-simulation for simulating the EMUs longitudinalimpact. Results showed that: influence of longitudinal force on the comfort could not be ignored, and because of longitudinal force,longitudinal comfort index increased by 200.75% maximum, stability index could not reflect the influence of longitudinal force on EMUsoperation quality.  
      关键词:EMUs;longitudinal impact;stability;comfort;simulation modeling;high-speed passenger transportation   
      1141
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907057 false
      发布时间:2021-12-13
    • LI Bi-yu,LIU Chang-qing,SHI Dong-shan,XIONG Yu-yu,XIN Ben-yu
      Issue 1, Pages: 37-40(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.008
      摘要:Combined with high-speed EMUs comfort requirements, 350 km/h high-speed EMUs wind ventilator equipment roles andfunctions were introduced and further elaborated from the device domestically developed technical solutions, design and manufacturingimplementation. Experimental verification and comparison results showed that 350 km/h high-speed EMUs domestic ventilation system metthe technical requirements, which could be used to replace the imported ventilation device with the same speed grade. The domestic devicehave the advantages of weight, maintenance and price with great market potential and social benefits.  
      关键词:350 km/h high-speed EMUs;wind ventilator equipment;inverters;vibration and noise reduction;vibration accelerationvalue   
      751
      |
      5
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907044 false
      发布时间:2021-12-13
    • DUAN Mu-Ying
      Issue 1, Pages: 41-43(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.009
      摘要:Aimed to the problem of БКГ-1 broad-gauge locomotive transportation on local norm rail, norm-rail transportation bogietechnical scheme for БКГ-1 locomotive body was presented. Transportation bogie design was combined with practical production condition,and with technical analysis, integral dynamic safety analysis of БКГ-1 locomotive body and transportation bogie was provided.  
      关键词:БКГ-1 locomotive;crossing rail transportation;bogie;technical scheme;safety analysis;whole car-body exportation;White Russia   
      1632
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907033 false
      发布时间:2021-12-13
    • FENG Wan-sheng,CHENG Chang,CHENG Hai-tao,LUO Jun
      Issue 1, Pages: 44-47(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.010
      摘要:To suppress high-speed carbody suspension components vibration of transformers, convertor, accumulator and otherequipment, rubber shock absorber was designed to reduce equipment vibration. By combining of theory analysis and engineering service,vibration relationship between rubber damper and transformer and car body connection was analyzed, as well as stiffness and dampingproperties matching, and appropriate parameter for damper was designed to avoid vibration between transformer and car body.  
      关键词:rubber damper;damping;vibration;performance test;traction transformer;high-speed train   
      930
      |
      4
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907019 false
      发布时间:2021-12-13
    • YANGHai-peng,SONGYan
      Issue 1, Pages: 48-50(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.011
      摘要:Aim to the present condition that signal system for urban rail transits project mostly was based on moving block train trafficcontrol system (CBTC) and appropriate fallback mode was taken into consideration for the CBTC systems in most cities, distributionprinciple of speed codes and speed codes changes in case of various failure modes under IATP fallback mode was studied with specificengineering practice, and detailed design was carried on for speed codes distribution scheme. With analysis of speed codes safety, the schemewas proved satisfy the design requirements.  
      关键词:IATP;protection principles;loop;speed codes;failure mode;urban rail transit   
      455
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20907008 false
      发布时间:2021-12-13
    • CHEN Qiang,LI Xiao-long,LIU Shao-ke
      Issue 1, Pages: 52-54(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.012
      摘要:Aim to the shortages of traditional PID levitation controller for maglev train, PID controller characteristic was analyzed, andnonlinear PID controller considering system error parameters was designed to realize system stable levitation. Simulation and test resultsshowed that the nonlinear PID controller had the advantages such as simple structure, easy for realizing, quick response, high precision andstrong anti-interference ability, obviously better than the traditional PID controller.  
      关键词:maglev levitation;maglev system;PID controller;nonlinear PID   
      848
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906998 false
      发布时间:2021-12-13
    • ZENG You-heng,CHEN Xi,LIU Shi-yong
      Issue 1, Pages: 55-57(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.013
      摘要:Aim to the quality problems of HXD3C locomotive, characteristic of HXD3C locomotive wheel set driving control wasdiscussed, and the key factor that lifting wheel set detection could not determine bearing velocity was pointed out. Technical routine of bearingvelocity determination with lifting wheel set detection was selected, and design idea and scheme to determine bearing velocity with hardwarewere presented and a novel signal generation device was developed. The novel devices had excellent applying effect, which not only providedstable data for acquisition, but also removed safety incipient fault for garage lifting wheel set operation, what is more, it presented a newvelocity determination idea for other locomotive.  
      关键词:bearing velocity determination with lifting wheel set detection;motor velocity signal;converter;photo-electricity sensor;traction converter;velocity determination;HXD3C locomotive   
      1535
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906985 false
      发布时间:2021-12-13
    • ZHANG Zhong-yang,QU Su-rong,ZHANG Xian-feng
      Issue 1, Pages: 58-60(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.014
      摘要:Basic structure, components and main function of the system were expounded. In the system, dispatching order literalretrieval and analysis model was built by using information process technology, with which, railway dispatching order was automaticallyanalyzed, retrieved , and rapidly generated train operation monitoring reveal files. The files was compared to manual editing monitoring revealfiles for finding and correcting its missing and error, which ensured train operation safety.  
      关键词:railway dispatching order;monitoring reveal files;LKJ equipment;intelligent;safety management   
      964
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906973 false
      发布时间:2021-12-13
    • ZHANG Xiang,CHEN Yan-ping,XIN Li,HU Ling-jun
      Issue 1, Pages: 61-64(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.015
      摘要:Main technical parameters, traction circuit principle, overall structure, component selection and test conditions of TGA23Atraction inverter were introduced. Type test and operation results showed that the traction inverter could satisfied 120 km/h metro vehicles.  
      关键词:TGA23A traction inverter;high voltage apparatus;IGBT;component selection;technical parameter;main circuit;metrovehicle   
      1286
      |
      5
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906959 false
      发布时间:2021-12-13
    • HAO Ming-yuan,WANG Xing-hua,WANG Yan-qin,ZHANG Qiu-min,LI Ying
      Issue 1, Pages: 65-68(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.016
      摘要:Electromagnetic conditions and standards of vehicle were analyzed, and EMC design idea of 100% low floor LRV includinglayout, wiring, grounding, shielding and auxiliary supply design was expounded with emphasis on low-frequency prevention. 100% low floorLRV EMC design involves overall layout, wiring, electrical set, electrical material, shielding and grounding, and need continuous improvement.  
      关键词:100% low floor;electromagnetic condition;electromagnetic radiation;shielding;EMC;LRV   
      982
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906945 false
      发布时间:2021-12-13
    • ZENG Ming-gao,YAN Zhi-yong,ZHANG Xiao,LIU Chang-qing
      Issue 1, Pages: 69-73(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.017
      摘要:In order to satisfy the requirements of metro vehicle high-power loading, electrical interface simplifying and weight reducing,integrated auxiliary power supply was developed with inverter, charger and output isolation transformer circuit integrated. Developmentscheme and technical characteristics of integrated auxiliary power supply from the circuit, structure and control were introduced. Auxiliarypower supply parameters were proved achieve the design goal by test.  
      关键词:integrated auxiliary power supply;inverter;charger;SPWM;metro vehicle   
      978
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906933 false
      发布时间:2021-12-13
    • ZHOU Xiao,LIU Yan-hui,HUANG Wei,MA Yu-fan
      Issue 1, Pages: 74-76(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.018
      摘要:Control principle, merits and drawbacks of CCQG light railway vehicle existing network control system were expounded, andbased above, upgrade and reconnection modification scheme was presented. With comparison, the upgraded network control system overallperformance had great improving.  
      关键词:CCQG light railway vehicle;network control system;upgrade;reconnection;technical modification   
      694
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906921 false
      发布时间:2021-12-13
    • PANG Yan-feng,YUAN Yue-sai
      Issue 1, Pages: 77-79(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.020
      摘要:Methods of brake regenerating energy utilization in urban rail system were discussed and compared, and based above, themost advantage method was recommended to improve the existing urban rail regenerating energy utilization.  
        
      923
      |
      5
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906910 false
      发布时间:2021-12-13
    • LI Jun,WANG Bo,ZHENG Xuan,CHEN Ming-guo
      Issue 1, Pages: 80-83(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.021
      摘要:Aim to the pantograph arcing problem in Guangzhou metro line 3 northern-extension project, pantograph application inseveral projects was compared and discussed to find the potential causes of arcing; then, with pantograph and catenary simulation, improvingmeasures and suggestions for pantograph were presented to ensure 120 km/h metro pantograph dynamic current-collection stable under stiffcatenary condition.  
        
      1115
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906898 false
      发布时间:2021-12-13
    • WANG Peng,XIA Shu-jie,CHEN Gao-hua,WANG Yi-min,GAO Zhi
      Issue 1, Pages: 86-89(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.023
      摘要:According to the existing condition of standard IEC 61373 not defining impact compensation parameter, combined with 3types of impact test requirement for locomotive vehicle devices, waveform compensation principle was analyzed with theoretical calculation,and different waveform compensation effects was verified by test. The results showed that fore-after half sine wave compensation was thebest suitable method for locomotive vehicle devices impact test with equal fore-after compensation pulse periods and impact compensatingcoefficient k<0.2.  
      关键词:locomotive vehicle;impact test;waveform compensation;vibration test bench   
      901
      |
      3
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906876 false
      发布时间:2021-12-13
    • GAO Lian-sheng,WU Yun,DENG Heng,SHEN Hui
      Issue 1, Pages: 90-93(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.033
      摘要:Hardware, software architecture and working principle of the conformance testing platform for TCN products were introduced.This testing platform could execute test and generate test report automatically for the device under test, and provided guarantee for interconnectionand interoperability between TCN network products which made by different countries and different manufacturers.  
      关键词:network product;conformance testing platform;TCN;MVB;WTB   
      918
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906864 false
      发布时间:2021-12-13
    • SHI Hua,BI Yue-kuan
      Issue 1, Pages: 94-96(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.025
      摘要:Network topological structure of DEMUs with two motor cars and one trailer, fault diagnosis system, fault classification andfault identification by C-Means Clustering Algorithm were introduced. The fault diagnosis system collected and processed information, then,according to the clustering core and the data sample, it produced the sum of square clustering criteria, last, it made decision analysis and outputdiagnostic results. Human machine interface could show the DEMUs fault and record it in files. The fault diagnosis system improved thereliability of the DEMUs and reduced the work of maintenance staff, promoting the train long-term stable running.  
      关键词:fault classification;diagnosis;C-Means Clustering Algorithm;network topology;diesel electric drive;DEMU   
      878
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906852 false
      发布时间:2021-12-13
    • QI Zhen-guo,HOU Xiu-juan
      Issue 1, Pages: 97-99(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.026
      摘要:BP neural networks technology was applied to the fault diagnosis of railway vehicle gearbox, and BP neural networksdiagnose model was created. An improved BP algorithm was put forward, and using the typical fault signal extracted from the routinediagnostic methods as input data of the neural network, simulation and testing in terms of the improved BP neural network were carried out.The results showed that the improved BP neural network system had the better performance of fault diagnosis and fault identification, andcould achieve the anticipated diagnosis result.  
      关键词:railway vehicle;gearbox;BP neural network;fault diagnosis;simulation and testing   
      863
      |
      2
      |
      0
      <HTML>
      <L-PDF><Meta-XML>
      <引用本文> <批量引用> 20906842 false
      发布时间:2021-12-13
    0