Guodong LI, Litong CUI, Wenhua WANG, et al. Study on Dynamic Problem of Speed-increasing EMUs on Lanzhou-Xinjiang Passenger Dedicated Line. [J]. Electric Drive for Locomotives (4):1-7(2021)
DOI:
Guodong LI, Litong CUI, Wenhua WANG, et al. Study on Dynamic Problem of Speed-increasing EMUs on Lanzhou-Xinjiang Passenger Dedicated Line. [J]. Electric Drive for Locomotives (4):1-7(2021) DOI: 10.13890/j.issn.1000-128x.2021.04.001.
Study on Dynamic Problem of Speed-increasing EMUs on Lanzhou-Xinjiang Passenger Dedicated Line
The Lanzhou-Xinjiang passenger dedicated Line is located in the northwest region of China with the natural environment of high temperature, severe cold and windy sand, which puts forward higher requirements for the safe and reliable operation of high-speed EMUs. When the running speed was 200 km/h, the EMUs operated in good condition. After the speed was increased to 250 km/h, the dynamic indicators such as the frame lateral acceleration and lateral ride index would significantly be increased, and be close to the limit values in some conditions. From the perspective of wheel wear, actual wheel-rail matching relationship and application environment, simulation analysis and vibration test were used to find the cause of the deterioration of vehicle dynamic performance. the lateral stability was improved by improving the rail profile, optimizing suspension parameters, and adjusting operation routes, the vehicle dynamic problems were solved well after the EMUs speed increase.
National Development and Reform Commission, Ministry of Transport of the People’s Republic of China, China Railway. Development and Reform Commission issued"Medium and Long-term Railway Network Planning"[EB/OL]. (2016-07-20) [2020-07-22]. http://www.gov.cn/xinwen/2016-07/20/content_5093165.htmhttp://www.gov.cn/xinwen/2016-07/20/content_5093165.htm.
Weather in Chuzhou. Climatic characteristics along the Lanxin high-speed Railway[EB/OL]. (2020-03-26) [2020-07-22]. https://www.czqxj.net.cn/qihou_47656https://www.czqxj.net.cn/qihou_47656.
Beijing Daily. Summary of highlights of the new national railway alignment on July 10, 2019[EB/OL]. (2019-07-10) [2020-07-22]. https://www.mrcjcn.com/business/jiaotong/302074.htmlhttps://www.mrcjcn.com/business/jiaotong/302074.html.
National Railway Administration of the People’s Republic of China. Specification for dynamic performance assessment and testing verification of rolling stock: GB/T 5599—2019[S]. Beijing: Standards Press of China, 2019.
铁道部标准计量研究所. 高速动车组整车试验规范[S]. 北京: 中华人民共和国铁道部, 2008.
Ministry of Railways of the People's Republic of China. Testing of high-speed electric multiple unit on completion of construction[S]. Beijing: Ministry of Railways of China, 2008.
刘宏友. 高速列车中的关键动力学问题研究[D]. 成都: 西南交通大学, 2003.
LIU Hongyou. Study on the key dynamic problems in high-speed train[D]. Chengdu: Southwest Jiaotong University, 2003.
王福天. 车辆系统动力学[M]. 北京: 中国铁道出版社, 1994.
WANG Futian. Vehicle System Dynamics[M]. Beijing: China Railway Publishing House, 1994.
POLACH O. Characteristic parameters of nonlinear wheel/rail contact geometry[J]. Vehicle System Dynamics, 2010, 48(1): 19-36.