您当前的位置:
首页 >
文章列表页 >
Analysis of Energy Absorption Device Operation in Changsha Metro Line 1
Urban Rail & Vehicle | 更新时间:2021-12-13
    • Analysis of Energy Absorption Device Operation in Changsha Metro Line 1

    • Electric Drive for Locomotives   Issue 5, Pages: 125-128(2019)
    • DOI:10.13890/j.issn.1000-128x.2019.05.027    

      CLC:

    扫 描 看 全 文

  • Zhangshuo PENG, Bin YANG, Yong CHEN, et al. Analysis of Energy Absorption Device Operation in Changsha Metro Line 1. [J]. Electric Drive for Locomotives (5):125-128(2019) DOI: 10.13890/j.issn.1000-128x.2019.05.027.

  •  

0

Views

6

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Energy Consumption Analysis for Changsha Metro Line 2
Study on energy consumption performance of permanent magnet synchronous traction system for trains on Ningbo metro line 4
Energy scheduling algorithm for urban rail active traction power supply system
Feasibility Study on Raising the Operation Speed of EMU from 350 km/h to 400 km/h
Research on Energy Saving Technology of Metro Permanent Magnet Synchronous Traction System

Related Author

No data

Related Institution

Changsha Metro Group Co., Ltd.
Operating Branch, Ningbo Rail Transit Group Co., Ltd.
CRRC Zhuzhou Institute Co., Ltd.
Hunan Vocational College of Railway Technology
National Railway Vehicles Engineering Research Center, CRRC Changchun Railway Vehicles Co., Ltd.
0