您当前的位置:
首页 >
文章列表页 >
Realization of Internal Time Synchronization of General Vital Computer in Railway Signaling System
更新时间:2021-12-13
    • Realization of Internal Time Synchronization of General Vital Computer in Railway Signaling System

    • Electric Drive for Locomotives   Issue 2, Pages: 53-56(2018)
    • DOI:10.13890/j.issn.1000-128x.2018.02.012    

      CLC:

    扫 描 看 全 文

  • YAN Guang, SHEN Yunqiang, ZAN Zhuang. Realization of Internal Time Synchronization of General Vital Computer in Railway Signaling System. [J]. Electric Drive for Locomotives (2):53-56(2018) DOI: 10.13890/j.issn.1000-128x.2018.02.012.

  •  

0

Views

3

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reliability Analysis of Vital Computer in Railway

Related Author

No data

Related Institution

No data
0