您当前的位置:
首页 >
文章列表页 >
ZC Simulator Implementation in TECIS Computer Interlocking Testing for Zhangjiang Test Line
更新时间:2021-12-13
    • ZC Simulator Implementation in TECIS Computer Interlocking Testing for Zhangjiang Test Line

    • Electric Drive for Locomotives   Issue 5, Pages: 109-112(2017)
    • DOI:10.13890/j.issn.1000-128x.2017.05.026    

      CLC:

    扫 描 看 全 文

  • LI Pengdong, CHEN Xin, REN Ying, et al. ZC Simulator Implementation in TECIS Computer Interlocking Testing for Zhangjiang Test Line. [J]. Electric Drive for Locomotives (5):109-112(2017) DOI: 10.13890/j.issn.1000-128x.2017.05.026.

  •  

0

Views

4

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on A New CBTC Signaling System Based on Train-to-train Communication
Exploration to Automatic Turn-back of CBTC Signaling
Design of Changsha Metro Line 2 CBTC System
Integration Design of Interlocking and Zone Controller in CBTC System
The Research and Realization of Track Layout Editor TOPOLOGY in Urban Rail Transit Signaling System

Related Author

No data

Related Institution

CRRC Zhuzhou Institute Co., Ltd.
China Railway Electrification Engineering Group Co., Ltd.
Zhuzhou CSR Time Electric Co., Ltd.
Beijing CSR Times IT Co., Ltd
Signaling & Communication Business Unit, Zhuzhou CSR Times Electric Co., Ltd.
0