您当前的位置:
首页 >
文章列表页 >
Research on Monitor Scheme of High-speed Railway Tunnel Base-bed Settlement
更新时间:2021-12-13
    • Research on Monitor Scheme of High-speed Railway Tunnel Base-bed Settlement

    • Electric Drive for Locomotives   Issue 4, Pages: 60(2017)
    • DOI:10.13890/j.issn.1000-128x.2017.04.015    

      CLC:

    扫 描 看 全 文

  • LIU Tiejun. Research on Monitor Scheme of High-speed Railway Tunnel Base-bed Settlement. [J]. Electric Drive for Locomotives (4):60(2017) DOI: 10.13890/j.issn.1000-128x.2017.04.015.

  •  

0

Views

2

下载量

0

CSCD

2

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Current Situation of Detection for Rail and Railway Tunnel and Development Trend of Intelligent Detection Robot
Investigation into rolling contact fatigue and wear of high-speed train wheels on long steep slope track
Estimation of wind deflection of high-speed railway catenary based on nonlinear finite element method
Research on the phased development characteristics of pantograph catenary arc under low air pressure and strong airflow
Influence of fluctuating transverse wind load on smoothness of high-speed train curve running

Related Author

No data

Related Institution

CRRC Academy Co., Ltd.
School of Mechanical Engineering, Beijing University of Science and Technology
State Key Laboratory of Traction Power, Southwest Jiaotong University
State Key Laboratory of Rail Transit Vehicle System, Southwest Jiaotong University
Technical Center, CRRC Qingdao Sifang Locomotive & Rolling Stock Co., Ltd.
0