您当前的位置:
首页 >
文章列表页 >
Application of Conditioning Brake Program in the Added Vehicle Project of Nanjing Metro Line 1
更新时间:2021-12-13
    • Application of Conditioning Brake Program in the Added Vehicle Project of Nanjing Metro Line 1

    • Electric Drive for Locomotives   Issue 6, Pages: 106-108(2016)
    • DOI:10.13890/j.issn.1000-128x.2016.06.026    

      CLC:

    扫 描 看 全 文

  • ZHANG Xiaojun. Application of Conditioning Brake Program in the Added Vehicle Project of Nanjing Metro Line 1. [J]. Electric Drive for Locomotives (6):106-108(2016) DOI: 10.13890/j.issn.1000-128x.2016.06.026.

  •  

0

Views

7

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Train Control and Management System of Nanchang Metro Line 1

Related Author

No data

Related Institution

Vehicle Center, Operation Branch, Nanchang Rail Transit Group Co., Ltd.
Technology Center, Zhuzhou CRRC Times Electric Co., Ltd.
0