您当前的位置:
首页 >
文章列表页 >
Auxiliary Converter System Used in Shenyang Metro Line 1 Vehicle
更新时间:2021-12-13
    • Auxiliary Converter System Used in Shenyang Metro Line 1 Vehicle

    • Electric Drive for Locomotives   Issue 4, Pages: 86-89(2016)
    • DOI:10.13890/j.issn.1000-128x.2016.04.020    

      CLC:

    扫 描 看 全 文

  • LI Shaobo, TANG Manlin. Auxiliary Converter System Used in Shenyang Metro Line 1 Vehicle. [J]. Electric Drive for Locomotives (4):86-89(2016) DOI: 10.13890/j.issn.1000-128x.2016.04.020.

  •  

0

Views

8

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Brief Analysis of Power Converters Standards for Rail Transit Rolling Stock
Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
Research of 350 km/h CEMUs Auxiliary Converter Parallel Control
Cover and Lug Optimization of Auxiliary Converter Based on OptiStruct Software
Application Design of CAN Bus in Locomotive Auxiliary Converter

Related Author

No data

Related Institution

Secretariat of National Technical Committee for Standardization of Traction Electrical Equipment and Systems
CRRC Zhuzhou Institute Co., Ltd.
Changsha Rail Transit Operation Co., Ltd.
State Key Laboratory for Traction and Control System of EMU and Locomotive
Locomotive & Car Research Institute, China Academy of Railway Sciences Co., Ltd.
0