您当前的位置:
首页 >
文章列表页 >
Electrical Reconnection Program Design for Argentina Roca Line EMUs
更新时间:2021-12-13
    • Electrical Reconnection Program Design for Argentina Roca Line EMUs

    • Electric Drive for Locomotives   Issue 2, Pages: 14-16(2015)
    • DOI:10.13890/j.issn.1000-128x.2015.02.005    

      CLC:

    扫 描 看 全 文

  • XU Qiang, CHEN Mingfeng, SU Zhaolong. Electrical Reconnection Program Design for Argentina Roca Line EMUs. [J]. Electric Drive for Locomotives (2):14-16(2015) DOI: 10.13890/j.issn.1000-128x.2015.02.005.

  •  

0

Views

2

下载量

0

CSCD

5

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Control of Short EMU Reconnection Passing Neutral Section
Control Scheme of on-board Signal System for Urban Rail Transit Train Reconnection
Maintainability Prediction of EMUs Traction Inverter
Maintainability Allocation of EMUs Electric Traction Systems
Network Control System Upgrade and Reconnection Modificationof CCQG Light Railway Vehicle

Related Author

No data

Related Institution

Technology Center, CRRC Qingdao Sifang Co., Ltd.
Hunan CRRC Times Signal & Communication Co., Ltd.
CSR Zhuzhou Institute Co., Ltd.
Technology Center, Changchun Railway Vehicles Equipment Co., Ltd.
0