您当前的位置:
首页 >
文章列表页 >
Three Core Systems Integration in Changsha Metro Line 2
更新时间:2021-12-13
    • Three Core Systems Integration in Changsha Metro Line 2

    • Electric Drive for Locomotives   Issue 4, Pages: 1-4(2014)
    • DOI:10.13890/j.issn.1000-128x.2014.04.001    

      CLC:

    扫 描 看 全 文

  • ZHOU Xiao-ming, XIAO Hua, CHEN Chao-lu. Three Core Systems Integration in Changsha Metro Line 2. [J]. Electric Drive for Locomotives (4):1-4(2014) DOI: 10.13890/j.issn.1000-128x.2014.04.001.

  •  

0

Views

5

下载量

0

CSCD

2

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of bogie control traction system within the intercity EMUs
Design of Changsha Metro Line 2 CBTC System
Arcing detection method of metro pantograph based on improved yolov4-tiny
Study on abnormal abrasion of metro pantograph
Research on random vibration fatigue of high-voltage electrical box based on FKM standard

Related Author

No data

Related Institution

R&D Center, CRRC Tangshan Co., Ltd.
Beijing CSR Times IT Co., Ltd
State Key Laboratory of Rail Transit Vehicle System, Southwest Jiaotong University
CRRC Changchun Railway Vehicles Co., Ltd.
School of Mechanical Engineering, Southwest Jiaotong University
0