您当前的位置:
首页 >
文章列表页 >
Network Control System Upgrade and Reconnection Modificationof CCQG Light Railway Vehicle
更新时间:2021-12-13
    • Network Control System Upgrade and Reconnection Modificationof CCQG Light Railway Vehicle

    • Electric Drive for Locomotives   Issue 1, Pages: 74-76(2014)
    • DOI:10.13890/j.issn.1000-128x.2014.01.018    

      CLC:

    扫 描 看 全 文

  • ZHOU Xiao, LIU Yan-hui, HUANG Wei, et al. Network Control System Upgrade and Reconnection Modificationof CCQG Light Railway Vehicle. [J]. Electric Drive for Locomotives (1):74-76(2014) DOI: 10.13890/j.issn.1000-128x.2014.01.018.

  •  

0

Views

2

下载量

0

CSCD

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Control of Short EMU Reconnection Passing Neutral Section
Design and Implementation of PHM Fault Screening for Network Control System of CRH2 EMU Based on MapReduce
Control Scheme of on-board Signal System for Urban Rail Transit Train Reconnection
Design of CRH2 EMUs Control System Redundant Safety
Train Network Control of Trailer Free Marshalling DMUs

Related Author

No data

Related Institution

Technology Center, CRRC Qingdao Sifang Co., Ltd.
CRRC Qingdao Sifang Co., Ltd.
Zhuzhou CRRC Times Electric Co., Ltd.
Hunan CRRC Times Signal & Communication Co., Ltd.
Hunan Vocational College of Railway Technology
0