XIONG Lü, LIU Zhilong. Preventive maintenance strategy of electric multiple unit critical equipment based on replacement repair. [J]. Electric drive for locomotives (5):23-27(2022)
DOI:
XIONG Lü, LIU Zhilong. Preventive maintenance strategy of electric multiple unit critical equipment based on replacement repair. [J]. Electric drive for locomotives (5):23-27(2022) DOI: 10.13890/j.issn.1000-128X.2022.05.004.
Preventive maintenance strategy of electric multiple unit critical equipment based on replacement repair
Considering that the entire electric multiple unit (EMU) needs to be withdrawn from service for carrying out preventive maintenance (PM) of the critical equipment
leading to an increase to downtime loss
the concept of replacement repair is proposed in this paper. Specifically
based on the preventive maintenance schedule
the involved critical equipment is replaced with another set of equipment with good performance and then delivered for maintenance
so as to overcome the shortage of sudden increase of service suspension loss caused by preventive maintenance. This paper took the EMU critical equipment as the research object. The preventive maintenance models were built respectively based on replacement repair and non-replacement repair
with the preventive maintenance reliability threshold as the decision making variable
the total maintenance cost of the EMU critical equipment in a replacement cycle as the decision making objective
and applying the 2-level imperfect maintenance measure for the EMU critical equipment. Based on the example analysis
the optimization results of preventive maintenance reliability threshold based on replacement repair are higher than that based on non-replacement repair
and the total maintenance cost of replacement repair is 22.2% lower than that of non-replacement repair. Therefore
the preventive maintenance strategy of the EMU critical equipment based on replacement repair can greatly reduce the total maintenance cost of equipment in a life cycle and can maintain the equipment at a higher reliability level.
关键词
动车组关键设备停机损失换件修维修总成本高速列车
Keywords
electric multiple unit (EMU)critical equipmentdowntime lossreplacement repairtotal maintenance costhigh-speed train
ZHANG Weihua, LI Quanfu, SONG Dongli. Thoughts on health management and condition-based maintenance of rolling stocks[J]. China Mechanical Engineering, 2021, 32(4): 379-389.
XIONG Lv, WANG Hong. Multi-level imperfect maintenance strategy for EMU components from perspective of failure risks[J]. China Mechanical Engineering, 2021, 32(4): 399-406.
LIU Chen, CHEN Minwu, SONG Yalin, et al. Research on optimization of maintenance plan for high-speed railway catenary system based on risk assessment[J]. Journal of Railway Science and Engineering, 2017, 14(2): 205-213.
YANG Guojun, WANG Hong, HE Yong, et al. Dynamic group maintenance strategy of EMU system under failure and economic dependence[J]. Journal of Railway Science and Engineering, 2021, 18(1): 31-37.
WANG Hong, XIONG Lv, HE Yong, et al. Optimization of opportunistic maintenance for electric multiple unit component considering failure risk[J]. Journal of the China Railway Society, 2019, 41(3): 79-85.
ZHAO Zeping, YAO Jianwei, ZHANG Kexin. Study of method to calculate the best preventive maintenance period for EMU's subsystem based on reliability theory[J]. Railway Locomotive & Car, 2014, 34(4): 85-89.
ZONG Gang, ZHANG Chao, LIU Wenzhi. Study on complexities in relational network of component maintenance for high-speed train in network perspective[J]. China Railway Science, 2013, 34(3): 105-108.
WANG Hong, XIONG Lv, DU Weixin, et al. Optimization of preventive maintenance for component of electric multiple unit with consideration of failure risk[J]. Journal of Mechanical Engineering, 2016, 52(24): 123-129.
LIN D M, ZUO M J, YAM R C M. Sequential imperfect preventive maintenance models with two categories of failure modes[J]. Naval Research Logistics, 2001, 48(2): 172-183.
LIU Zhilong, WANG Hong, DU Weixin, et al. Preventive maintenance decision optimization for metro vehicle equipment based on cost-effectiveness[J]. Journal of Railway Science and Engineering, 2016, 13(1): 146-151.