您当前的位置:
首页 >
文章列表页 >
Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
Railway Rolling Stock | 更新时间:2021-12-09
    • Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System

    • Electric Drive for Locomotives   Issue 2, Pages: 26-30(2021)
    • DOI:10.13890/j.issn.1000-128x.2021.02.005    

      CLC:

    扫 描 看 全 文

  • Jizhen HU, Changyi GONG, Wenchao WANG. Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System. [J]. Electric Drive for Locomotives (2):26-30(2021) DOI: 10.13890/j.issn.1000-128x.2021.02.005.

  •  

0

Views

8

下载量

0

CSCD

3

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Energy consumption analysis of permanent magnet traction system in Changsha rail transit
A traction load modeling method of metro trains based on the regenerative braking energy effective utilization and its application
Research on parameters optimization of coupler and draft gear system for type B metro train
Research on anti-slip and anti-slide for driverless metro train
Research on the Construction of Urban Rail Transit Smart Station

Related Author

No data

Related Institution

Changsha Metro Operation Co., Ltd.
Beijing Urban Construction Design & Development Group Co., Ltd.
Coupler and Draft Gear Business Division, CRRC Braking System Co., Ltd.
Zhuzhou CRRC Times Electric Co., Ltd.
CRRC Changchun Railway Vehicles Co., Ltd.
0